Navigating Challenges in Subsea Projects: Technological Innovations and Solutions
Monday, 5 May
610
Technical Session
Technology advancements of HPHT equipment and systems design, verification & validation will be presented. Challenges encountered and lessons learned during HPHT projects will be covered.
-
0200-0218 35669Challenges And Opportunities For Subsea Multiphase Boosting Application In Petrobras
-
0220-0238 35587Buzios 7 Capital Project - From Conception To Execution
-
0240-0258 35847Unlocking Deepwater Tiebacks With Springs Subsea Desulfation Technology
-
0300-0318 35713Value Case Of An Integrated Subsea Seawater Desulfatation And Injection System
-
0320-0338 35684Barrier Fluid-less Subsea Water Injection Pump Qualification
-
0340-0358 35781Technical Solutions And Innovations In Yggdrasil Project
-
0400-0418 35926Unveiling The Power Of Sound For Deepwater Assets
-
Alternate 35650Tree Connector Mechanical Running Tool (TCMRT)
-
Alternate 35689Renewing Fiber Optics Infrastructure On Mature Offshore Assets At Campos Basin