Advancements in Design and Installation of Offshore Facilities and Subsea Structures
Monday, 5 May
610
Technical Session
This technical session will address key challenges and innovations in installation of offshore facilities and subsea structures. Presentations will explore real-time subsea visual positioning technology for accurate structure placement, along with a challenging float-on and float-off operation for FPSO units, detailing strategies for successful deployment. Attendees will learn about the consequences of accidental pipeline or umbilical releases during brownfield pipelay operations and the importance of risk management in these scenarios. Insights will also be shared on loading out mega offshore platforms, highlighting the challenges faced and solutions implemented.
Session Chairperson(s)
Sponsoring Society:
- Institute of Electrical and Electronics Engineers, Oceanic and Engineering Society (IEEE-OES)
-
1030-1048 35724Re-usable And Lightweight Composite Material Lift Bar For The Installation Of Subsea Structures
-
1050-1108 35855The Consequences Of Accidental Pipeline Or Umbilical Releases During Brownfield Pipelay Operations
-
1108-1126 35725Loading-out Mega Offshore Platforms From China: The Challenges And Solutions
-
1130-1148 35823Transportation And Installation Of Two 90km 230 Kv Mega Offshore Composite Cables
-
Alternate 35880Enabling Operations In Extreme Environments With Jumper On Demand Solution