Bonga FPSO: Mega Project's Journey to 1 Billion Barrels
Thursday, 9 May
602
Technical / Poster Session
The Bonga field development in offshore Nigeria reached 1 billion barrels of production in early 2023 through continuous improvement, life extension, and brown-field project excellence. The project leadership will share their journey to 1 billion barrels and their expansion of the field to a total of 77 wells when starting from a FID plan of 576 million barrels using 16 wells at first production in 2005.
Chairperson(s)
-
0930-0948 35176Behavioural Change as a Catalyst for Sustained HSE Performance - The Bonga Safety Leadership Story
-
0950-1008 35300Bonga Field: A Phased Development to One Billion Barrels
-
1010-1028 35416Best Practices In Well Construction - The Journey To One Billion Barrels Oil Production In Bonga Field
-
1030-1048 35131Bonga FPSO: Asset Management Excellence
-
1050-1108 35124Powering Bonga to One Billion Barrels Through Innovative Project Delivery and Technology Deployment
-
1110-1128 35242Bonga North Story: Beyond 1 Billion Barrels - Driving Growth with Subsea Tiebacks in Deepwater Nigeria
-
1130-1148 35112Bonga Main Life Extension Project: An In-Situ Life Extension of an FPSO Using FAIR+ER Methodology and Digital Twin Technology as Basis for Scope Identification and Definition